The Chandlers, Cork.

Project Summary
An exclusive development of detached and semi-detached houses, with a distinctive architectural style. The Chandlers is a section of the large 'Rushbrooke Links' development, which entails phases 1-6. There is approximately 400 Fusion homes throughout the development.

Client: John Fleming Construction Ltd.

Location: Rushbrooke Links, Cobh, Co. Cork.

Architect: Walsh Design Group, Co. Cork.

Number of House Type: 5

Total Units: 164

Area: 128, 707 sq ft

Fusion Build Time: 17 weeks on-site.

Construction
First and Second Floor: 254mm Fusion steel joist fitted with OSB.
Walls: External walls incorporate Fusion StIF Panel Technology. All load bearing and non load bearing walls are constructed of Fusion LGS stud and track.
Roof: Timber roof truss.