Compass Quay
Project Summary
An exclusive development of detached, semi-detached and terraced houses within walking distance of Kinsale town centre.
Client: Fleming Construction
Location: Kinsale, Co. Cork.
Architect: Walsh Design Group, Co. Cork.
Number of House Types: 13
Total Units: 108
Area: 140, 255 sq. ft. / 13, 030 sq. m.
Fusion Build Time: 27 weeks on-site.
Construction
First Floor: 254 mm. steel joist fitted with OSB.
Walls: External walls incorporate Fusion StIF Panel Technology. All load bearing and non load bearing walls are constructed of Fusion LGS stud and track.
Roof: Timber roof truss.
|
|
 |
|