Heatherfield
Project Summary
An exclusive development of Detached Houses on the Western fringe of Cork City.
Client: John Fleming Construction Ltd.
Location: Waterfall, Co. Cork.
Architect: Hogan Associates, Cork.
Number of House Types: 2
Total Units: 57
Area: 138, 135 sq. ft./1, 2833 sq. m.
Fusion Build Time: 28 weeks on-site.
Construction
First Floor: 254mm Fusion steel joist fitted with OSB.
Walls: External walls incorporate Fusion StIF Panel Technology. All load bearing and non load bearing walls are constructed of Fusion LGS stud and track.
Roof: Timber roof truss.
|
|
 |
|