RiverSide, Cork
Project Summary
An exclusive development of seven house types. Riverside offers a variety of two and three storey house options on this sloped site located within walking distance of Cobh town.
Client: John Fleming Construction Ltd.
Location: Rushbrooke, Cobh, Co. Cork, Ireland.
Architect: Walsh Design Group, Co. Cork, Ireland.
Number of House Type: 5
Total Units: 99
Area: 101, 400 sq. ft. / 9, 420 sq. m.
Fusion Build Time: 20 weeks on-site.
Construction
First and Second Floor: 254mm Fusion steel joist fitted with OSB.
Walls: External walls incorporate Fusion StIF Panel Technology. All load bearing and non load bearing walls are constructed of Fusion LGS stud and track.
Roof: Timber roof truss.
|
|
 |
|