• Client

    Circle Anglia

  • Location

    London

  • Contractor/Developer

    Willmott Dixon

  • Project Size

    3,500m² – 4 storey

  • Build Time

    13 weeks

The project: This Extra Care Home incorporates significant hot rolled steel transfer structures above ground floor.

The client has benefited from absence of post construction shrinkage.

The use of the Fusion system meant brickwork was started before tiling of the roof, as were some internal works, allowing Willmott Dixon to significantly reduce their overall construction period.