• Client

    Circle Anglia and Inspace

  • Location

    Islington, London

  • Project Size

    3,250m² – 4-storey

  • Build Time
    11 weeks

The project: Fusion cassettes, with integrated hot rolled steel to large open areas of ground floor. Structural bathroom pods manufactured and installed by Fusion. Very tight site.